Move to www.1688club.com now,This Website will be closed
SearchSearch
Location:Home »Companys » Energy » Energy Projects

Choke Manifold

ID:114331 View:592
Date Listed: 2016-07-28 17:17:08 Country: China»Shaanxi»Xian
Poster: Ms.Celia Wang Company: Shaanxi Gaoton Petroleum Machinery Co., Ltd.
Location: Room 1633, 16 Fl., Exhibition International Building, No.1 Chang'an North Road, Xi'an, Shaanxi, P.R.C. Website: Shaanxi Gaoton Petroleum Machinery Co., Ltd.
Email: gaoton@aliyun.com Mobile: 86-13402943512
Fax: 86-029-87872212 MSN:

?Choke Manifold1.ApplicationChoke manifold is necessary device to control the well kick successfully and execute the pressure control technology on oil/gas well in the course of drilling, as it is, the device is adopted to execute new drilling-well?s technique of balance pressure, which can avoid pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valve?s opening, so balanced drilling? can work under minimum pressure-difference.2.Assembly & structureChoke manifold consists of choke valve, gate valve, pipeline, fittings and pressure gauge etc, see gate valve part and choke valve part in the above drawing.3.Working principleWhen the pressure rising in well, fluid in well can be released in utilization of the choke valve opening/closing in choke manifold to control casing pressure, which can directly blow out through gate valve as the casing pressure is quite high.4.SpecificationPressure level is divided into five levels, i.e 14Mpa, 21Mpa,35Mpa,70Mpa and 105Mpa,it can be also designed according to the requirement of customer.5.Operation requirement (1)All the working pressures of parts in choke manifold should be matched with the working pressure of the BOP stack used; (2)Choke manifold should be installed at the place where operator approach it conveniently, pressure test should be executed as installation, while the sealing test pressure should be equal to the rated working pressure; (3)Pipeline should be so smooth and straight as possible, the corner of the pipeline should be made of 120~shaped forged steel bent pipe, which should have adequately large bore;(4)The working pressure gauge should be installed;(5)In winter, the choke manifold be able to work under a low temp condition.Parts List:ItemComponentQty Material1Skid Base12Hydraulic Choke13Five?Way Piece*Gate Valve15Pressure G....

Please Note that this information was issued on BestB2B.com!

Insulation Panel,roof panels2024-01-29

EPS sandwich panel2024-01-29

Insulated Metal Panels Increas2024-01-29

Insulated Metal Roof Panel2024-01-29

Light Insulated Metal Wall Pa2024-01-29

Insulated Metal Wall Panels2024-01-29

Insulated sandwich panels / In2024-01-29

Trapezoidal Roof Panel / Wall2024-01-29

100G QSFP28 SWDM4 100m LC Opti2024-02-01

100G QSFP28 SR4 100M MPO Optic2024-02-01

200G QSFP56 SR4 100m MPO Optic2024-02-01

400G OSFP SR8 100m MPO Optical2024-02-01

400G QSFP-DD LR8 10KM LC Optic2024-02-01

400G QSFP-DD LR4 10KM LC Media2024-02-01

400G QSFP-DD 4x100G LR 10KM 2024-01-29

Important Safety Warning: Avoid fraud by meeting all sellers in-person to pay for items. BestB2B.COM does not offer any transaction or payment services.