Move to www.1688club.com now,This Website will be closed
SearchSearch

Aluminum parts with rapid tool

ID:182326 View:1271
Date Listed: 2019-09-06 14:16:52 Country: China»Guangdong»Guangzhou, Guangdong, China
Poster: Emily Ruan Company: Shenzhen Ruitai Mold Technology Co.,Ltd
Location: 1103room,tianyue building,zhongxin road,NO 110,sh Website: Shenzhen Ruitai Mold Technology Co.,Ltd
Email: cncprototypingrt@gmail.com Mobile: 18566753885
Fax: 0755-27207646 MSN:

Aluminum parts with rapid tooling PRODUCT DESCRIPTION For the problem of the injection mold processing process, there are generally four stages, first preparation stage, second surface processing, reheating stage, and final debugging identification stage. Each stage plays a key role, such as the preparation stage. It can be imagined that it is the same thing to have a plan and an implementation plan. In the preparation stage, we need the overall requirements of the mold, design, parts, and process. , materials, finished product estimates, etc. are written and determined. Heat treatment stage, an important part of quality assurance

Please Note that this information was issued on BestB2B.com!

Insulation Panel,roof panels2024-01-29

EPS sandwich panel2024-01-29

Insulated Metal Panels Increas2024-01-29

Insulated Metal Roof Panel2024-01-29

Light Insulated Metal Wall Pa2024-01-29

Insulated Metal Wall Panels2024-01-29

Insulated sandwich panels / In2024-01-29

Trapezoidal Roof Panel / Wall2024-01-29

100G QSFP28 SWDM4 100m LC Opti2024-02-01

100G QSFP28 SR4 100M MPO Optic2024-02-01

200G QSFP56 SR4 100m MPO Optic2024-02-01

400G OSFP SR8 100m MPO Optical2024-02-01

400G QSFP-DD LR8 10KM LC Optic2024-02-01

400G QSFP-DD LR4 10KM LC Media2024-02-01

400G QSFP-DD 4x100G LR 10KM 2024-01-29

Important Safety Warning: Avoid fraud by meeting all sellers in-person to pay for items. BestB2B.COM does not offer any transaction or payment services.