Move to www.1688club.com now,This Website will be closed
SearchSearch

Thermal Shock Testing chamber

ID:28129 View:736
Date Listed: 2018-05-31 16:00:33 Country: China»Guangdong»Dong Guan
Poster: Rachel Lee Company: ASLI (CHINA) TEST EQUIPMENT CO.,LTD
Location: JinHui Industrial Park, LiXin town,East City district 523000,DongGuang City,China Website: ASLI (CHINA) TEST EQUIPMENT CO.,LTD
Email: sales9@aslitesting.com Mobile: 8676913826932967
Fax: 0086-769-22851784 MSN: asli898@live.cn

Thermal Shock Testing chamber application: Temperature shock tester is used to test the capability of material structure or composite materials to withstand the continuous environmental changes between extremely high temperature and low temperature during a short period, and therefore understand the chemical changes or physical damages caused by expansion from heat and contraction from cold in the shortest possible time. It is applicable to metals, plastic, rubber, electronics amongst other materials. The test result can be used as a reference or basis for product improvement. Thermal Shock Test Equipment / features: 1.It is divided into three zones: high temperature zone, low temperature zone, and testing zone. The test sample is in static mode. 2.Using touch-control graph control as operation interface, easy to operate. 3.Applying wind route conversation to the shock method to distribute temperature to the testing zone for cold and thermal shock measurement. 4.For high temperature shock or low temperature shock, max. time is up to 999H, and max. circulation cycles are 9999 times. 5.The system can be used for automatic Circulation Shock or manual selective shock. 6.Adopt binary cooling system, with quick cooling effect. Cooling method is water cooling. 7.Can entering normal temperature. RS-232 and RS-485 communication. technical parameters: Model:TS-252(A~C) Internal Dimension WxHxD ( mm):700x600x600 External Dimension WxHxD (mm):1700x2100x1750 Exposure Time of High/Low Temperature:Exposure Time of High Temperature:+60℃~+150℃(200℃ is Optional) 30Mins;Exposure Time of Low Temperature:-10℃~Type A:-40℃/ Type B -55℃/ Type C -65℃ 30Mins Temperature of Heat-Storing Slot/Heating Time:RT~200℃/About 45mins Temperature of Cool-storing Slot/Cooling Time:RT~-75℃/ About 100mins Temperature Recovery Time/ Conversion Time:≤5min/≤5sec Control Accuracy / Distribution Uniformity:±0.5℃/±2℃ Internal and External Material:Material of the inn....

Please Note that this information was issued on BestB2B.com!

Insulation Panel,roof panels2024-01-29

EPS sandwich panel2024-01-29

Insulated Metal Panels Increas2024-01-29

Insulated Metal Roof Panel2024-01-29

Light Insulated Metal Wall Pa2024-01-29

Insulated Metal Wall Panels2024-01-29

Insulated sandwich panels / In2024-01-29

Trapezoidal Roof Panel / Wall2024-01-29

100G QSFP28 SWDM4 100m LC Opti2024-02-01

100G QSFP28 SR4 100M MPO Optic2024-02-01

200G QSFP56 SR4 100m MPO Optic2024-02-01

400G OSFP SR8 100m MPO Optical2024-02-01

400G QSFP-DD LR8 10KM LC Optic2024-02-01

400G QSFP-DD LR4 10KM LC Media2024-02-01

400G QSFP-DD 4x100G LR 10KM 2024-01-29

Important Safety Warning: Avoid fraud by meeting all sellers in-person to pay for items. BestB2B.COM does not offer any transaction or payment services.